Project Highlights

  • Advance Auto Parts Distribution Center – Remington, IN

  • General Contractor:  Sullivan Corporation, Noblesville,  IN

  • Square Footage: 550,000

Success Story

Our first contract began after shell construction of facility. D&K Electric provided wiring, lighting and connections for master sorting unit, various conveyor systems, and 3-level sorting modules.Like often happens, the owner was sufficiently impressed with our work, that upon completion of original contract with the General Contractor, the Advanced Auto management team contracted directly with us for their next project. We provided design/build application to meet requirements for equipment necessary for startup of production.


We did installation, wiring, and connections for 90 charging stations for electric fork lifts.Due to increased demands, we provided a 2000 amp 277/480 volt service 3-phase upgrade to the existing original 3000 amp 277/480 volt 3-phase service with installation of parallel 2500 KVA REMC Transformers.


New Service required a 700 ft. directional bore for REMC primary.

We provided lighting occupancy sensors through aisles and sorting modules throughout this massive 500,000 square foot distribution center.